In order to ensure the normal operation of a fully automatic winding machine, normal inspection and proper practical operation are not good and short key flows. a guide to machinery and equipment should be created first. it is used to record and view the working situation and existing problems of the automatic winding machine for reading articles, and carefully check the workbench, wire slide and its key drag surfaces when you start work, if there are obstacles, articles, residue, etc. It must be cleared, cleaned and oiled, and carefully check whether the moving mechanism of the machine and equipment is new, researched and injured. If it is necessary to inform the machine equipment personnel to check and analyze whether it is caused by common faults, and make a good account, check the safety precautions, switching power supplies, limit switches and other machinery and equipment should be complete, check that the household appliance distribution cabinets should be closed and firm, and the grounding devices of electrical equipment are outstanding. Check to see if the spare parts of the machinery and equipment are outstanding. Pressing pulley, felt clamp, construction reel, porcelain components, etc., should be complete, properly installed, high-speed work trial run investigation work is not stable, whether abnormal noise these. Although the work is tedious, it can reasonably distinguish whether the machinery and equipment is in an outstanding condition and prevent the occurrence of common failures.
If there is no abnormality after inspection, then all the normal starting machines and equipment can carry out the winding work, and in the working process, as the actual operation staff are also required to be strict in accordance with the application standards, there are many inadvertently actual operations that will destroy machines and equipment at different levels. In the process of application, you should carefully operate and not do anything that has nothing to do with the work. When leaving the machinery and equipment due to a matter, stop, closed switching power supply, pneumatic valves, should be carried out in accordance with processing standards to carry out winding. It is forbidden to increase cable diameter, number of turns and angular speed at will. It is forbidden to exceed the standard, overload or overload the automatic winding machine, the winding shaft and mold should be clamped properly, and it is forbidden to tighten the mold by extending the rocker lifting torque, etc. the speed regulation, clamping and adjustment of the mechanical equipment of the spindle bearing and the wire arrangement mechanism should be carried out after stopping, and the protective equipment is set up to better ensure the safety of the actual operation staff after the abnormal situation of the machine and equipment.
It is forbidden to disassemble and disassemble the safety protection equipment on the private silver machine equipment, and it is forbidden to immediately place articles, product workpieces and other dirt on the automatic winding machine, especially in the ball screw and the winding line, and pay close attention to the work situation. if you find abnormal phenomena such as poor posture, shock, burning, crawling, noise, stench, and injuries, you should stop immediately to check, and after fault detection, you can continue to work. After the work should be properly shut down and cleaned, first put the electrical equipment, pneumatic power switches and other operating power switches on the non-working parts, completely stop the work of the machine and equipment, seal and control the switching power supply and pneumatic valves, eliminate the dirt left on the machine and equipment in the process of winding, carefully offset the wire row mechanism, put the spool and other places for oil maintenance, and carefully fill in the machine and equipment guide to describe and improve.
What is explained above is the maintenance method of the automatic winding machine. I hope it will be helpful to you after reading it. If you want to know more about the automatic winding machine, welcome to consult the customer service online or call our service hotline for consultation. We will try our best to provide you with quality service (upper right corner of the website)!
About Us
Company Profile Corporate Culture Qualification Honor Working momentsProduct Center
DC series AC series Internal series Rotor series Special series Production line seriesIndustry Application
The field of automobile and electric vehicle. The field of industrial automation equipment The field of high precision electronic equipment. The field of modern household appliances.News
Company News Industry InformationContact Us
Contact Us Online Message
DONGGUAN QIWEI ELECTRIC MACHINERY TECHNOLOGY CO.,LTD.
Tel:86-0769-8916 0998
E-mail:gd_qiwei@163.com ywbl@qw-cn.com
Address:4/F, No.2, Xiaobu 2nd Road Guanjingtou Village
Fenggang Town Dongguan City, Guangdong , China